Noreas Inc.Noreas Inc.
  • Home
  • Company
  • Services
    • Environmental Investigation and Remediation
    • Natural Resources and Permitting
    • Consulting and Engineering
    • Design-Build Construction
  • Featured Projects
    • Environmental Investigation and Remediation
    • Natural Resources and Permitting
    • Engineering and Consulting Services
    • Design-Build Construction
  • Clients
  • Career
  • Contact Us
    • Office Locations
  • No menu assigned!

Soil Vapor Extraction and Enhanced In Situ Bioremediation

  • 0 Shares Share
  • 4

project-soil-vapor-extractiont

NOREAS designed, installed, and has been operating a 200 CFM soil vapor extraction (SVE) system to remediate soil, soil vapor, and groundwater impacted with chlorinated solvents associated with historical dry cleaning operations at the site. The system includes a series of 9 SVE wells and 16 vapor monitoring probes connected to the central treatment system via a network of underground and aboveground piping. Because the site is located in a highly congested area of Los Angeles that is zoned for mixed use (commercial and residential), several critical technical factors were considered during the project design. In particular, the system design and construction were customized to minimize the project footprint and allow for minimal disruption to the busy operations of the current business (auto repair facility). Furthermore, the proximity of the site to adjacent residential properties required additional system controls to maintain acceptable noise levels during operations.

System monitoring data indicate a reduction of more than 90% in VOC concentrations in soil vapor across the site after the first 6 months of SVE operations. As a result, the SVE operations are expected to be completed ahead of estimated schedule and within the project budget. A pilot test for enhanced in situ bioremediation (EISB) of groundwater is scheduled, followed by full-scale implementation of the groundwater remedy. Current design for the full-scale EISB remedy includes the injection of a sufficient electron-donor substrate into a series of 36 multi-depth wells located at the downgradient edge of the dissolved VOC plume.   Determination of remedial cleanup goals is based on extensive risk assessment efforts using site-specific conditions, such as need for cleanup goals to be protective of nearby residential occupants. Based on current status, site closure is anticipated for 2014.

  • Previous Project

ABOUT NOREAS

NOREAS provides scientific, technical, engineering, and construction management support to federal agencies, local governments, and utility companies, as well as a diverse group of private industries throughout California, Nevada, and Arizona.

QUICK LINKS

  • Home
  • Company
  • Services
  • Clients
  • Featured Projects
  • Career
  • Contact Us

CONTACT US

NOREAS, Inc. Orange County
Address: 16361 Scientific Way
Irvine, CA 92618
Phone: (949) 467.9100
Fax: (949) 398.8758
Email: RFI@noreasinc.com

NOREAS, Inc. San Diego
Address: 2534 State Street
San Diego, CA 92101
Phone: (619) 516-8181
FAX: (619) 557-8341
Email: RFI@noreasinc.com

© 2025 Noreas Inc.. | All Rights Reserved | Powered by Dynamic Concepts

  • Home
  • Company
  • Services
    • Environmental Investigation and Remediation
    • Natural Resources and Permitting
    • Consulting and Engineering
    • Design-Build Construction
  • Featured Projects
    • Environmental Investigation and Remediation
    • Natural Resources and Permitting
    • Engineering and Consulting Services
    • Design-Build Construction
  • Clients
  • Career
  • Contact Us
    • Office Locations